Broughton High School Renovation

Market: K-12 Education Construction Projects
Location: Raleigh, NC
Architect: Cherry Huffman Architects
SF: 235,000

About

Originally built in 1960, Broughton High School underwent a total renovation of their existing 45,000 square foot gymnasium facility and 190,000 square foot main campus building. The renovation included a new gym, classrooms, offices, locker rooms, lobby, windows, elevator, sprinkler, HVAC, electrical, and plumbing. The renovation of the three-story main building, which was constructed in 1929, was continuously occupied with 1,700 students, plus faculty during the construction phase.